Hyatt Centric Hotel, Melbourne

SPMG was engaged by Hickory during the final six months of the project to oversee the coordination and integration of all services at the Hyatt Centric Melbourne, which features 280 guest rooms and a restaurant inspired by Melbourne’s vibrant food scene.

Hyatt Centric Hotel, Melbourne

Project Manager – Commissioning, Testing and Handover – Services and Infrastructure

Project:

Hyatt Centric Hotel, Melbourne

Role:

Hickory

Architectus, Robert Bird Group (Structural Engineer), Norman Disney & Young – NDY (Building Services Engineer), Lote Consulting (Fire Engineering), Inhabit Group (Facade Consultant), Cundall (ESD Consultant)

Client:

Hickory

Partners:

Summary

Specialised was engaged by Hickory during the final six months of the project to oversee the coordination and integration of all services at the Hyatt Centric Melbourne, which features 280 guest rooms and a restaurant inspired by Melbourne’s vibrant food scene.

The hotel is fully compatible with the “World of Hyatt” app, allowing for contactless digital check-in and the ability for guests to update their room preferences, such as lighting and temperature, prior to arrival. Specialised’s responsibilities included facilitating client interface and project coordination meetings, managing and reporting on commissioning to meet ESD requirements, and leading commissioning, integration, and testing meetings. They oversaw all trades, managing the interface of services into a converged IT network, and provided design and engineering advice during the project’s completion.

A significant challenge involved the installation of a converged network connecting over 1,500 devices, necessitating coordination of this system alongside the commissioning management of mechanical (BAS), electrical, communications, security, hydraulics, fire systems, and lifts, in collaboration with Hyatt and the building owner, Little Projects.

Works Included

Client interface and project coordination meetings​

Management and reporting on of all commissioning to suit ESD requirements​

Lead Commissioning, integration and Testing meetings​

Overseeing all trades and managing the interface of all services into a converged IT network​

Design and Engineering advice during completion and coordination

Challenges

To allow operation of this system a Converged Network was installed within the site connecting >1500 devices. Co-ordination of this system along with commissioning management of Mechanical (BAS), Electrical, Comms, Security, Hydraulics, Fire and Lifts was also completed in conjunction with Hyatt and the building owner Little Projects​​

For further information contact

Mark Simmons

Mark Simmons